AEG provided environmental, health and safety support during power plant abatement, dismantling and demolition activities. Located in the environmentally sensitive Barrio Logan area under the watchful eye of the Environmental Coalition Group, this project was completed in two years without incident. AEG prepared technical specifications for asbestos/lead-based paint abatement activities and, Health and Safety Plan (HASP) which addressed anticipated health and safety risks. AEG’s staff of industrial hygienists/third party monitors under the direct supervision of the Board Certified Industrial Hygienist observed that required work practices and appropriate engineering controls were implemented. AEG established airborne contaminant action levels which triggered adjustments to work practices and or mitigation measures. AEG prepared a draft Community Health and Safety Plan (CHASP) which included micro scale meteorological data collection, upwind and downwind perimeter fenceline and neighborhood air monitoring to protect the public. Numerous regulatory audits/inspections were conducted by various agencies. No complaints were noted and the project remained in compliance.