Advanced Environmental Group, Inc.

  • Email
  • Facebook
  • LinkedIn
949.361.7797
  • Home
  • About Us
  • Services
  • Projects
  • Experience
  • Contact Us
Home / Projects / Power Plant Abatement Dismantling and Demolition – San Diego, CA

January 30, 2007 by AEG Inc.

Power Plant Abatement Dismantling and Demolition – San Diego, CA

Abatement, Dismantling and Demolition of 230 MW Power Plant, San Diego, CAAEG provided environmental, health and safety support during power plant abatement, dismantling and demolition activities. Located in the environmentally sensitive Barrio Logan area under the watchful eye of the Environmental Coalition Group, this project was completed in two years without incident. AEG prepared technical specifications for asbestos/lead-based paint abatement activities and, Health and Safety Plan (HASP) which addressed anticipated health and safety risks. AEG’s staff of industrial hygienists/third party monitors under the direct supervision of the Board Certified Industrial Hygienist observed that required work practices and appropriate engineering controls were implemented. AEG established airborne contaminant action levels which triggered adjustments to work practices and or mitigation measures. AEG prepared a draft Community Health and Safety Plan (CHASP) which included micro scale meteorological data collection, upwind and downwind perimeter fenceline and neighborhood air monitoring to protect the public. Numerous regulatory audits/inspections were conducted by various agencies. No complaints were noted and the project remained in compliance.

Filed Under: Projects

Advanced Environmental Group, Inc.

1530 Via Tulipan
San Clemente, CA 92673

Ofc (949) 361-7797
Fax (949) 361-1520

  • Email
  • Facebook
  • LinkedIn
  • Contact Us
  • Services

· Advanced Environmental Group, Inc. © 2023 All Rights Reserved ·

Hosted by Protos Host & Designed by Protos Designs